Originally, this was a bare metal roof building. We cut insulation to fit within the panel ribs, added insulation and installed plywood to create an acceptable substrate for the new EPDM roof system. Another challenge was that most of the motorized units for the fryers and ovens had to be raised, along with a new gutter system. All had to be done while the store was in operation, so timing was very important. Along with the roof, we had to install safety rails and ladders with additional steel on the interior of the facility in order to support the ladders.
Originally, this was a bare metal roof building. We cut insulation to fit within the panel ribs, added insulation and installed plywood to create an acceptable substrate for the new EPDM roof system. Another challenge was that most of the motorized units for the fryers and ovens had to be raised, along with a new gutter system. All had to be done while the store was in operation, so timing was very important. Along with the roof, we had to install safety rails and ladders with additional steel on the interior of the facility in order to support the ladders.