It was a complete tear off as all the roof areas were cleared down to the deck, whether concrete or metal. We went back on the roof replacement with new insulation, coverboards, and the new modified bitumen system with a bright white cap sheet.
We started out just servicing one or two original roof locations before it turned into a total of five roof areas. We would finish one roof location and remobilize to the next location, usually on a different level, presenting one of the bigger challenges in moving from each of the respective locations. Additionally, while operating at a food processing plant and adhering to all of the COVID-19 protocols, it was absolutely critical that we kept our sanitary efforts at the forefront of the project while installing great roof systems throughout. Shoe cleaning and handwashing at each facility checkpoint, hair nets, goggles, masks were all a portion of our approach in ensuring a safe and responsible jobsite throughout the duration of the project.
Our Supreme team organized and executed a very successful project, leaving the customer with a new watertight system and feeling very satisfied with the installation of the new roof system.